Project location: - The project is located on the east bank of the Tigris River in Rusafa side / Zaafaraniya area, (5) Km South of Baghdad City.
Date of contract: - 4/12/2008.
Contract Period: - Two years of work.
The amount of the contract: - (69.621.944.844) Iraqi Dinar.
Project Description: --
1st : Renewal of the project to design capacity (68000 m3) per day with adds a new line with capacity (22000 m3) per day to raising the total project capacity to (90000 m3) per day.
2nd . : - Establishment new raw water station in Abu Nawas with capacity 95000 m3 per day
3rd . : - Extension ductile pipe diameter (900) mm to transfer raw water from the new water station to the project.
|